product

MASTER DECK FINISHER

Attached

Content

Concrete Deck Finisher

Model : MDF-2400EDR



Master Deck Finisher

Depending on the work site, the work can be performed automatically or manually. 

It is designed to be forward after one round trip or two rounds of work of roller, and has a forward distance of 0-60CM and usually about 30CM.

Spread the concrete during the first screw and roller transfer and form the concrete surface with the second polishing roller.

The third is finished with a finishing plate, and the last fourth is treated with a cotton cloth , thick vinyl and artificial grass to obtain the surface required by the site.


Concrete Deck Finisher

Master Deck Finisher 2400

c44b54558bf5201987489c3004945681_1651687093_3608.JPG

Model : MDF-2400EDR  

1. Although the length of the finisher varies by model, it is possible to pack at a time from at least 4m to at most 31m in width.

2. One rear-lim is 3 m and can be adjusted according to the width of the road. Secure each rear-limit with six bolts.

3. There are four driving legs, with height adjustment and one driving leg can move 2.4m from side to side, making rail installation easier.

4. Reverse reciprocating motion is an electric motor that can be adjusted at random to the left and right speeds and uses sharp curves and circular flooring,

5. Power uses 220v-380V triangles and has no noise or smoke.


Bridge Deck Finisher

c44b54558bf5201987489c3004945681_1651687110_2483.JPG

Model : MDF-2400EDR 

Easy operation

The remote control allows the driver to select a safe place to work.

Automatic and manual work is possible to stop or change the direction of the roller Cage at 

any point when the obstacle protrudes during the operation.


c44b54558bf5201987489c3004945681_1651687301_4517.JPG 

Challenge PRI "0" with 2 screws and 2 Laura mounts.

Clean surface and double the speed of work

Master Deck finisher is designed with Inter Heavy Industries' own know-how designed to access PRI 0 required by highway sites.


c44b54558bf5201987489c3004945681_1651687312_8011.JPG 

Power of the left-right transfer motor and the spread-out-of-concrete auger relieve the worker's fatigue.

The speed of work at the site is adjustable due to inverter operation and does not require many workers.


c44b54558bf5201987489c3004945681_1651687231_4554.JPG

The spread of concrete

Concrete theorem roller

Concrete surface finishing plate

Selection of light wood or brushes according to the condition of concrete

Roller Cage reciprocating chain

Deck finisher pre-reverse driving trajectory

a separate horizontal control rail from the rear rail.


Work Platform

c44b54558bf5201987489c3004945681_1651687433_2136.JPG

Model : WP-2400E  

WP-2400E type of work truck, it is easy to disassemble and assemble according to the width of the bridge, can operate forward 
and backward, and can be operated by a remote button switch. Curing ash spraying, curing gun covering, and other cotton finishing.
 

c44b54558bf5201987489c3004945681_1651687499_7725.JPG


Inter Master Deck Finisher

Concrete Deck Finisher 3200

506664b80578a956ede909f13542d5a2_1577262990_6815.JPG

Model : MDF-3200EDR

 

506664b80578a956ede909f13542d5a2_1577262994_0073.JPG

Production of the country's first 32-meter-long master deck finisher. Two deck finishers with a full width of 62m on the road connecting to the Incheon Bridge. 

 

506664b80578a956ede909f13542d5a2_1577262997_1973.JPG

Set up deck finisher by railing on highway rail versus outside. 

 

506664b80578a956ede909f13542d5a2_1577263000_2032.JPG

Two master deck finishers are installed simultaneously with the left and right rails and the Center rails 62 meters across the road. 

 

506664b80578a956ede909f13542d5a2_1577263003_1342.JPG

It is possible to work according to the concrete surface requirements of the site without wavering or sagging of the left or right side of the flat-bed roller carriage. 


Master Deck Finisher

506664b80578a956ede909f13542d5a2_1577263082_5516.JPG506664b80578a956ede909f13542d5a2_1577263085_3449.JPG506664b80578a956ede909f13542d5a2_1577263088_1587.JPG
 
Model : MDF-3200EDR 

Inter Heavy Industries Master Deck Finisher Fabrication Plant

 

c44b54558bf5201987489c3004945681_1651686883_4865.jpg  c44b54558bf5201987489c3004945681_1651686883_6336.jpg  c44b54558bf5201987489c3004945681_1651686883_8937.jpg

c44b54558bf5201987489c3004945681_1651686912_537.jpg  c44b54558bf5201987489c3004945681_1651686914_2239.jpg

1e8ac42f2f96bb29b1660500b423ff78_1651787974_2748.jpg  1e8ac42f2f96bb29b1660500b423ff78_1651787974_3277.jpg

1e8ac42f2f96bb29b1660500b423ff78_1651787974_3799.jpg  1e8ac42f2f96bb29b1660500b423ff78_1651787974_4237.jpg

INTER HEAVY INDUSTRIES CO.,LTD

Inter Building
239 Kyeondalsan-ro, Ilsandong-gu, Goyang-si, Gyeonggi-do, Korea
Tel : 031-968-1055
e-mail : inter1055@naver.com